Kitchens & Bathrooms

Bathroom Renovation Checklist for Melbourne Homeowners

By Master Framers Build Team5 min readUpdated 29 June 2026

Use this checklist to plan a bathroom renovation in Melbourne. Cover style, layout, fittings, finishes, lighting, regulated trades, budget and timeline before you sign anything.

Use this checklist to plan a bathroom renovation in Melbourne. It will not replace conversations with your builder, but it will make those conversations much sharper.

Style and inspiration

  • Mood - calm, sharp, warm, hotel-like?
  • Reference images or saved boards
  • Existing home style to match or contrast

Layout and measurements

  • Bath, shower or both?
  • Single or double vanity?
  • Toilet location and door swing

Fixtures and fittings

  • Tapware finish and brand
  • Bath style
  • Shower system
  • Vanity and basin

Tiles and finishes

  • Floor tile
  • Wall tile
  • Feature tile or stone
  • Grout colour

Lighting and ventilation

  • Vanity lighting
  • General lighting
  • Heat / fan combination unit

Plumbing / electrical / waterproofing

  • Licensed and qualified trades involved as required
  • Pipe routes and electrical points planned
  • Waterproofing scope agreed

Budget and contingency

  • Total comfortable budget
  • Contingency for surprises (commonly 10–15%)

Timeline and access

  • Start window
  • Family arrangements during the works
  • Use of nearby bathroom

Demolition and waste

  • Skip access
  • Dust and protection plan

Final checks

  • Defect walk-through
  • Care and maintenance instructions

Use this checklist and ask Master Framers Build about your bathroom renovation.

We can walk through it with you.

Talk to Us

Frequently asked questions

How long does a bathroom renovation usually take?

Several weeks once site work starts, depending on scope, materials and trades.

Do I need to choose all materials up front?

Most materials should be selected before site works so the program is not interrupted.

Who is responsible for waterproofing?

Waterproofing must be done by appropriately qualified trades to Victorian requirements. We coordinate this.

Related services

Need help with this?

Whether you are planning a renovation, need framing support, or want a carpenter who communicates clearly and works to a deadline, Master Framers Build can help you understand the next step.

WhatsApp us