How Much Does Decking Cost in Melbourne?
Decking is not priced by square metre alone. Size and shape, board selection, ground conditions, footings, the subframe, site access, stairs and screening, and whether an existing deck has to come out all change the scope of work. This guide explains what a carpenter assesses before quoting, so you can prepare the information needed for an accurate price.
In this article
Decking is one of the most common questions we are asked to price in Melbourne, and it is also one of the hardest to answer over the phone. Two decks that look the same size on a plan can involve very different amounts of work once the ground, the height, the access and the finishing details are taken into account.
This guide explains what actually drives the cost of a deck so you can understand a quote rather than compare numbers in isolation. We have deliberately not published prices or price ranges, because a figure quoted without seeing a site is not useful to you.
Why every deck is priced differently
A deck is a structure, not a surface. The boards you walk on are the last part of the job and often not the largest part of the cost. Underneath them sit footings, bearers and joists that have to carry load, resist movement and stay out of trouble with moisture. What sits under the deck is usually what separates one price from another.
- The size and shape of the platform
- The height above ground and how that height is supported
- Ground conditions and the footings required
- Subframe material and spans
- Board selection and fixing method
- Stairs, screens, balustrades and edge details
- Site access and how materials reach the work area
- Whether an existing deck or structure has to be removed
Size, shape and layout
Area matters, but shape matters too. A simple rectangle uses material efficiently and is quick to set out. Once you introduce angles, curves, steps in level, or a deck that wraps around a corner of the house, the amount of cutting, setting out and additional framing increases, and offcut waste rises with it.
Board direction also plays a part. Laying boards on an angle or in a pattern is achievable, but it changes joist spacing and adds labour.
How you plan to use the space
A deck intended for a table and chairs has different requirements from one that will hold an outdoor kitchen, a spa or heavy planters. Concentrated loads may need additional framing or footings, so it is worth telling your carpenter early what will sit on the deck.
Material selection: hardwood and composite
Board selection changes both the material cost and the way the deck is built. Hardwood and composite behave differently, use different fixing systems and have different maintenance expectations over time. Some composite systems also specify particular joist spacings, which affects the subframe below.
Neither option is automatically the right choice. We have written a separate comparison covering appearance, maintenance, weather exposure and comfort underfoot.
Keep reading
Planning a deck or pergola in Melbourne?
Master Framers builds hardwood and composite decks, pergolas and outdoor structures across metro Melbourne. Send us your suburb, photos, approximate measurements and project ideas for an initial review.
Send Plans and PhotosWays to get in touch
Ground preparation and footings
Before anything is built, the ground has to be prepared. That can mean clearing vegetation, removing an old slab or paving, levelling, and dealing with drainage so water is not trapped under the new structure.
Footings carry the deck into the ground. The number, depth and size of footings depend on the height of the deck, the loads it carries, the spacing of posts and the conditions on site. Sloping ground, reactive soil, rock, tree roots, and existing services all influence how footings are formed and how long that stage takes.
- Sloping sites generally need deeper or stepped footings
- Excavation near services has to be approached carefully
- Poor drainage may need to be resolved before framing starts
- Hand excavation in tight yards takes longer than machine work
Timber or steel subframe
The subframe is the structure of bearers and joists that sits between the footings and the boards. Treated timber subframes are common and well understood. Steel subframe systems are also used, particularly where long spans, low clearances or dimensional stability are a priority.
The choice affects cost in more than one direction. A steel subframe can carry different spans and may reduce the number of posts and footings, while a timber subframe may suit a simpler deck. What matters is that the subframe is designed for the span, the loads and the exposure, not chosen only on the price of the material.
Site access
Access is one of the least visible cost drivers and one of the most real. Where a vehicle can reach the work area, materials and waste move quickly. Where every board, bag of concrete and barrow of spoil has to travel through a house, down a side path or over a fence, labour time increases for the same finished deck.
Narrow side entries, steep driveways, limited parking, shared access and restricted working hours in some streets all belong in this category. Mentioning access when you make contact helps avoid surprises later.
Stairs, screens and balustrades
The flat platform is rarely the whole job. Stairs require their own framing, stringers, treads and footings, and their cost increases with height and width. Balustrades add posts, fixings and infill. Privacy screens, skirting to close in the underside, and built-in seating or planters all extend the scope.
These elements are worth deciding on before quoting, because adding them later can mean revisiting framing that is already built.
Removing an existing deck
If there is a deck already in place, removal is part of the job. That includes demolition, disposal, and dealing with whatever is found underneath. Old footings may need to be removed or worked around, ground conditions may be different from what was expected, and drainage problems that were hidden by the old structure often become visible at that point.
Sometimes a full replacement is not required. If your existing deck is tired rather than failing, it is worth assessing what is actually wrong before deciding.
Related reading
What we need in order to quote properly
Send this with your enquiry
- Your suburb and street access situation
- Approximate length and width of the proposed deck
- The height difference between the house floor and the ground
- Photos of the area from several angles, including the ground surface
- Any plans, drawings or engineering you already have
- Whether an existing deck or paving has to be removed
- How you intend to use the space, including heavy items
- Any preference on boards, stairs, screening or balustrades
With that information we can talk sensibly about scope. Where something cannot be determined from photos, such as ground conditions or the state of an existing subframe, an onsite look is usually the next step.
In summary
Decking cost in Melbourne comes down to the structure below the boards as much as the boards themselves. Size and shape, ground preparation, footings, subframe, access, stairs and demolition all move the number. The more accurately you can describe your site, the more accurate the quote you receive will be.
Planning a deck or pergola in Melbourne?
Master Framers builds hardwood and composite decks, pergolas and outdoor structures across metro Melbourne. Send us your suburb, photos, approximate measurements and project ideas for an initial review.
Send Plans and PhotosWays to get in touch
Frequently asked questions
›Why will not a builder give me a price per square metre?
A square metre rate assumes an average deck on average ground. Two decks of identical size can involve very different amounts of excavation, footings, subframe material and edge detailing, so a rate quoted without seeing the site can be misleading in either direction.
›Does a raised deck cost more than a low deck?
Raised decks usually involve more structure. Taller posts, larger footings, bracing, stairs and balustrades all add material and labour compared with a low platform sitting close to the ground.
›Does site access change the price?
It can. Where materials have to be carried through a house or down a narrow side path, and where excavation spoil has to be removed by hand or barrow, the labour component increases compared with a site a vehicle can reach.
›What information should I send for a decking quote?
Your suburb, approximate measurements, photos of the area from several angles, the height difference between the house floor level and the ground, any plans you already have, and how you intend to use the space. If there is an existing deck, photos of the underside and edges help.
›Do I need to decide on boards before getting a quote?
Not necessarily. It helps to say whether you are leaning towards hardwood or composite, because board selection affects both material cost and fixing method, but a quote can be prepared with options.
Related services
Need help with this?
Whether you are planning a renovation, need framing support, or want a carpenter who communicates clearly and works to a deadline, Master Framers Build can help you understand the next step.
Related articles
Decking and Pergolas: Creating Outdoor Spaces That Feel Built-In, Not Added On
A deck or pergola should feel like part of the home. Here is how to plan one so it does - not like an afterthought.
Timber vs Composite Decking: Which Is Better for Melbourne Homes?
A practical comparison of hardwood and composite boards for Melbourne conditions, without claiming one is always the better choice.
Deck Repair vs Replacement: How to Assess an Existing Deck
What to look at on a tired deck, why new boards do not always solve the problem, and when an onsite assessment is the right next step.